Electrical Engineering, ( ISI ), Volume (93), No (3), Year (2011-2) , Pages (117-126)

Title : ( The impacts of capabilities and constraints of generating units on simultaneous scheduling of energy and primary reserve )

Authors: mostafa rajabi mashhadi , Mohammad Hossein Javidi Dasht Bayaz , M. Sadegh Ghazizadeh ,

Citation: BibTeX | EndNote

Abstract

Abstract Frequency control, as an ancillary service, is usually provided by generation reserves. Modern generating units have special technical capabilities; e.g., their governor operation mode can be selected to be either active or passive, their ramp rate can be selected to be either normal or fast, etc. On the other hand, generating units have some technical constraints; e.g. some generating units cannot participate in primary frequency control at their capacity limits. In this paper, operational capabilities and constraints of generating units are incorporated in a “simultaneous scheduling of energy and primary reserve” problem. Furthermore, a heuristic iterative method (based on genetic algorithm) is proposed to obtain the optimal scheduling. The impacts of capabilities and constraints on scheduling are investigated through simulation studies. Simulation results depicts that taking these capabilities and constraints of generating units into account, not only reduces the total operational cost of generating units, but also will end up with a feasible solution for the system, even in cases where the previously proposed methods fail.

Keywords

Primary reserve · Simultaneous scheduling · Ramp rate · Ancillary services · Frequency control · Genetic algorithm
برای دانلود از شناسه و رمز عبور پرتال پویا استفاده کنید.

@article{paperid:1025194,
author = {Rajabi Mashhadi, Mostafa and Javidi Dasht Bayaz, Mohammad Hossein and M. Sadegh Ghazizadeh},
title = {The impacts of capabilities and constraints of generating units on simultaneous scheduling of energy and primary reserve},
journal = {Electrical Engineering},
year = {2011},
volume = {93},
number = {3},
month = {February},
issn = {0948-7921},
pages = {117--126},
numpages = {9},
keywords = {Primary reserve · Simultaneous scheduling · Ramp rate · Ancillary services · Frequency control · Genetic algorithm},
}

[Download]

%0 Journal Article
%T The impacts of capabilities and constraints of generating units on simultaneous scheduling of energy and primary reserve
%A Rajabi Mashhadi, Mostafa
%A Javidi Dasht Bayaz, Mohammad Hossein
%A M. Sadegh Ghazizadeh
%J Electrical Engineering
%@ 0948-7921
%D 2011

[Download]