Title : ( INTEGRATED BUILDING INFORMATION MODELLING (BIM) WITH SUPPLY CHAIN AND FEED-FORWARD CONTROL )
Authors: Mojtaba Maghrebi , Travis Waller , Claude Sammut ,
Abstract
One of the major causes of delays in construction sites belongs to the delays in delivering materials. This paper introduces the integrated Building Information Modelling (BIM) model combined with a supply chain and a controlling system, along with its efficiency for alleviating the negative effects of delays caused by a lack of materials on construction sites. So, firstly the concept of feed-forward control is discussed as a prevention feature in a monitoring system. Then the integrating BIM model with a supply chain is introduced. Finally this case study has shown how the enhanced BIM model can incorporate the feed-forward control in order to decrease the risks of delays caused by a lack of materials in construction. Moreover, this case study might be used as a decision support system for managers to prevent a construction site from future delays by providing valuable information about the required materials in advanced.
Keywords
, building information modelling, supply chain, feed-forward control@article{paperid:1075003,
author = {Maghrebi, Mojtaba and Travis Waller and Claude Sammut},
title = {INTEGRATED BUILDING INFORMATION MODELLING (BIM) WITH SUPPLY CHAIN AND FEED-FORWARD CONTROL},
journal = {YBL Journal of Built Environment},
year = {2013},
volume = {1},
number = {2},
month = {December},
issn = {2063-997X},
pages = {25--34},
numpages = {9},
keywords = {building information modelling; supply chain; feed-forward control},
}
%0 Journal Article
%T INTEGRATED BUILDING INFORMATION MODELLING (BIM) WITH SUPPLY CHAIN AND FEED-FORWARD CONTROL
%A Maghrebi, Mojtaba
%A Travis Waller
%A Claude Sammut
%J YBL Journal of Built Environment
%@ 2063-997X
%D 2013